|
|
|
|
01-09-2013
New bulbous bow was fitted during the dry docking.
Flemming Bach checking steel Work during the fabrication of the new bulbous bow
Propeller "Fairing cone and rudder bulb) was installed during the dry docking
Departure from CIC Lixin Sanlin Shipyard
|
|
|
|
|
|
MECHANICAL
&
ELECTRICAL SUPPORT
Company details:
Sp/f MES
Birnugøta 14
FO – 100 Tórshavn
Faroe Islands
+298-519735
V-number: 559679
mes@mes.fo
peter@mes.fo
kenneth@mes.fo
|
|
|
|
|